Upon review of operations, AirPower solution consisting of aluminum overhead rail, bridge crane to suspend one (1) manipulator for the tire lift process, and one (1) bridge to suspend a pneumatic hoist for the F15 Rim process for the original C5 aircraft application. C5 Solution installed in 2013.

Due to increase in the C130 aircraft process requirements, Air Power was contacted to provide an additional solution for the C130 unit in September 2015.

An additional bridge was added, to allow processing for the larger C130 tire application (tires in excess of 400lbs) to allow pickup, positioning and processing of these components.

Air Power Inc provided a TurnKey solution for both C5, and C130 tire applications.

 

Results

Implementation will reduce injuries, enhance efficiency, improve quality and ergonomics in the support of the war fighter mission.

“An effective and user-friendly solution that was way overdue” –Bobby Munda, WRAFB 402MXE

“Awesome, absolutely awesome!” –Candace Lauderdale, Safety Specialists, WRAFB